Old pipes: polybutylene, galvanized, lead and when to repipe
The pipe in a house is only as good as its weakest material. Three older types cause most repipes: polybutylene, galvanized steel and, at the service line, lead.
Last reviewed October 30, 2026 against the sources listed below. General information, not insurance or legal advice.
Polybutylene (gray plastic)
Polybutylene is a flexible gray (sometimes blue or black) plastic pipe used in many homes and manufactured homes from the late 1970s until the mid-1990s. Fittings and pipe failures led to a national class-action settlement, and the claims process has long since closed. Look for gray pipe stamped "PB2110" at the water heater, under sinks or where the line enters. Insurers and buyers often ask about it, and many owners replace it before it fails.
Galvanized steel
Galvanized pipe was common in homes built before the 1960s and 70s. It rusts from the inside, so the signs are low pressure that gets worse over time, rusty water after the pipes sit, and leaks at threaded joints. The EPA notes that galvanized pipe that is or was downstream of lead pipe can collect lead and release it later, which is one reason utilities now inventory it.
Lead service lines
Federal rules required every community water system to submit an inventory of its service lines, classified as lead, galvanized requiring replacement, non-lead or unknown, by October 16, 2024, and to make it available to the public. Ask your water utility whether your line is listed and what material it is; in the City of Newberry, the city owns the line up to the meter and the owner owns it from the meter to the house. The EPA's health-based goal for lead in drinking water is zero.
What a repipe involves
- New supply lines, today usually PEX or copper, run through walls, the attic or the crawl space.
- Small openings in drywall at fixtures, patched afterward. Crawl space homes are often easier and quicker.
- A permit and inspection; in unincorporated Newberry County the county building department issues it.
- Typically water is off during the day only, for a few days in an average house.
Repair or repipe?
One leak in otherwise good copper is a repair. Repeated leaks, polybutylene, or galvanized with low pressure are signs a repipe will cost less than chasing failures. Ask for a written scope that says what pipe is being replaced, what is being left, and who patches the walls.
Frequently asked questions
What does polybutylene pipe look like?
Usually flexible gray plastic, sometimes blue or black, often stamped PB2110. It was used from the late 1970s to the mid-1990s.
How do I find out if I have a lead service line?
Ask your water utility. Federal rules required water systems to inventory service line materials by October 16, 2024 and make the inventory available to the public.
Policies vary. Check your own policy and ask your insurer or agent about anything that affects your claim. Rules can change; this page reflects the sources below as of October 30, 2026. NewberrySCPlumbing.com is not a plumber, insurer, adjuster or law firm.
Find local help
Plumbers and well contractors serving Newberry County · Ask for help with a frozen or burst pipe · Who to call · Counties and towns
Sources
- Hoechst Celanese Corp. v. Fry, Fla. 5th DCA 1997 (describes the national polybutylene class settlement)
- U.S. EPA: Basic information about lead in drinking water
- U.S. EPA: Planning and developing a service line inventory
- 40 CFR 141.84: Service line inventory and replacement requirements
- City of Newberry Utilities: FAQs (water main vs service line, discolored water, emergency numbers)
- Newberry County Building Inspection